
Similar Posts

Bulk carrier «QUEEN OF LUCK»
Delivery and replacement of the hydraulic coupling of the propeller shaft of the ocean container ship “QUEEN OF LUCK” of the company Victoria Ocean way Ltd., Athens. In the autumn of 2014, we performed work…

Bulk Carrier «SCOPE»
Installing the differential monitoring system for fuel consumption on the main engine and 3 diesel-generators. Displaying the data on the operator’s console in the central control room. Transmitting the CSV-format data to the ship’s network….

Cruise ferry «BALTIC QUEEN»
Installation Engine group measurement with volume-type flowmetering system (group of Main Engines and group of Auxiliary engines). Connection to the FCM system Anemometer and Inclinometer. Installation of two torque-meters on propeller shafts.Mass acceleration flowmeter for…

Cargo vessel «CONESTE»
A linear measurement system for fuel monitoring and metering for the main engines was installed. Diesel generators have been prepared for connection to the system in the future. The boiler has been prepared for connection…

Trauler «PROJECT 170701»
The specification has been developed and the design has been carried out fully for a Fuel consumption monitoring system and integrated system of automatization and management of technical means (automated control system) of the vessel…

Ferry “Wrango”
A task: Mechanism control automation Solution: Our new automation system has been installed: – APS system – Measurements of levels in ballast and other tanks with information output to the operator panel – Installation of…