Similar Posts
Cargo-passenger ferry SUPERSTAR
A task: Solution: Installation of a fuel consumption control system on fuel preparation modules of 4 main engines, 3 diesel generators and 2 boilers. Installation of toriometers on propeller shafts – 2 pcs, information output…
Bulk Carrier «PROUD»
Installing the differential monitoring system for fuel consumption on the main engine and 3 diesel-generators. Displaying the data on the operator’s console in the central control room. Transmitting the CSV-format data to the ship’s network.Thanks…
Chemical tanker “Sichem Mumbai”
Task: Control over fuel consumption for the Main Engine. Installation of a fuel additive dosing system. Problem identified: Non-transparent reporting system for fuel consumption Solution: Installation of a differential fuel consumption control system on the…
Tug “Nibulon”
Task: Automation of control of ship mechanisms Solution: – Supply of a centralized control system – Management and emergency alarms – 3pcs – Start-module. Output of information to adjustment work on the system centralized control…
Cruise ferry «BALTIC QUEEN»
Installation Engine group measurement with volume-type flowmetering system (group of Main Engines and group of Auxiliary engines). Connection to the FCM system Anemometer and Inclinometer. Installation of two torque-meters on propeller shafts.Mass acceleration flowmeter for…
Fishing vessel «ATLANTIC HERMES»
The specification has been developed and the design has been carried out fully for a system of differential fuel consumption control on 2x Main engines, 2 diesel generators and a boiler. Installation of the torsiometer…