Cargo-passenger ferry SUPERSTAR
A task: Solution: Installation of a fuel consumption control system on fuel preparation modules of 4 main engines, 3 diesel generators and 2 boilers. Installation of toriometers on propeller shafts – 2 pcs, information output…

Icebreaker «BOTNIKA»
Monitoring the bunkering line and fuelling on board the ship, displaying data on LCD panels in the engine boiler room. Bunkering system helped the ship’s crew to challenge a lack of 19 tons of fuel…

Trauler «PROJECT 170701»
The specification has been developed and the design has been carried out fully for a Fuel consumption monitoring system and integrated system of automatization and management of technical means (automated control system) of the vessel…

Cruise ferry «BALTIC QUEEN»
Installation Engine group measurement with volume-type flowmetering system (group of Main Engines and group of Auxiliary engines). Connection to the FCM system Anemometer and Inclinometer. Installation of two torque-meters on propeller shafts.Mass acceleration flowmeter for…

Passenger and freight ferry “Patria Seaways”
Installing the differential monitoring system for fuel consumption on 2 main engines with displaying the data on the operator’s console in the central control room. Installing the monitoring repeater interfaced with a GPS-module on the…

Bulk Carrier «PROUD»
Installing the differential monitoring system for fuel consumption on the main engine and 3 diesel-generators. Displaying the data on the operator’s console in the central control room. Transmitting the CSV-format data to the ship’s network.Thanks…