Similar Posts

Cargo-passenger ferry SUPERSTAR
A task: Solution: Installation of a fuel consumption control system on fuel preparation modules of 4 main engines, 3 diesel generators and 2 boilers. Installation of toriometers on propeller shafts – 2 pcs, information output…

Bulk carrier “Portage”
Objective: To establish control over fuel consumption. Solution: Installation of a differential system on the main engine and 3 diesel generators. Information output to the operator panel in the CPU. Output of information to the…

Hydrographic vessel “Albatross”
Solution: Manufacturing and supply of propeller shaft tachometer “TA-12M” consisting of: -Local indication device (PDI) – 2 pcs. Production and delivery of the panel of signal and distinctive lights “SKILINE-M” for 16 lights, with power…

Tanker «Ugo Ocha»
At the request of the client, a fuel consumption metering system was installed for ship boilers and diesel generators. 2 boilers and 3 diesel generators. The system is assembled on the basis of Coriolis type…

Bulk Carrier «SCOPE»
Installing the differential monitoring system for fuel consumption on the main engine and 3 diesel-generators. Displaying the data on the operator’s console in the central control room. Transmitting the CSV-format data to the ship’s network….

Tug “Nibulon”
Task: Automation of control of ship mechanisms Solution: – Supply of a centralized control system – Management and emergency alarms – 3pcs – Start-module. Output of information to adjustment work on the system centralized control…